NC Iowa | 1500 sq ft. basement icf 8' walls, form a drain footings forms, rebar, pump truck charges, all labor. $20,520.00
2" foam under floor, with pex tubes and 12kw boiler (installed myself) and electric hookup to boiler. another $4700.00
basement floor is warm. it tales about $1.50-$2.00 a day @.043 cents kwh to heat. some of this heat helps out upstairs also (lp gas).
i don't see how mice can get in the icf. form from the inside or outside. something must not have been done right. it has to be covered to prevent sunlight from ruining it. | |
|