AgTalk Home
AgTalk Home
Search Forums | Classifieds (1) | Skins | Language
You are logged in as a guest. ( logon | register )

NRCS Woes
View previous thread :: View next thread
   Forums List -> AgTalk CafeMessage format
 
John Smith
Posted 3/22/2024 14:55 (#10675453 - in reply to #10675421)
Subject: RE: NRCS Woes


South Central Illinois

They can be frustrating,
Easier to just do it yourself,
Not rocket science or an interstate highway,
I have 2 steel culvert pipes, 36” diameter and 60’ long.
Installed in the 50’s
Bottoms rusted out in the 90’s
Slope is good, ordered 3 yards of concrete for each one.
Mixed it soupy and covered the bottom with concrete.
I did make a drag to help with the flow.
Used the concrete chute to analyze the proper consistency.
Still working after 30 years.

Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)