| Last i had done ran just over $600 acre. 4" laterals on 0' spacings & 6" submains. The main is an existing 12" clay That ran basically cut the field in half. To avoid tapping into the main in too many places we ran sub mains along each side of the main about 25' away and connected those to the 12" on the outlet side of the field. Not only made installation easier but that way in the main should ever need replaced there's only a couple connections to be found and reconnected.
We also had a local company come in a grid map all the tile fro ease of location if ever any work needs to be done. | |
|