Posted 2/13/2024 18:00 (#10622183 - in reply to #10622130) Subject: RE: Fixing my driveway in the yard
Will be expensive, but you will need 2 inch crushed stone put down first. Then put berm material down to lock the 2’s together. Then spread 3/4 inch stone on top. It is best to do this when the driveway is dry.