AgTalk Home
AgTalk Home
Search Forums | Classifieds (99) | Skins | Language
You are logged in as a guest. ( logon | register )

Putting tile in a field
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
Clay SEIA
Posted 4/3/2024 22:48 (#10692936 - in reply to #10692714)
Subject: RE: Putting tile in a field



I can find no fault with the study you posted, HOWEVER- they use an example for "heavy clay" of .2" per hour hydraulic conductivity.   The subsoil perc rates on some of the types we are working with are .03-.06" per hour.   Not knocking what you are doing if it works for your location at all, but those are the reasons why a generic spacing/size/depth recommendation doesn't apply equally everywhere.   And it's why a bunch of 3" pipe, shallower and at maybe 1/2 or 1/3 the spacing of what was typical installation certainly before widespread yield monitors in combines, has become more standard "here". 

Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)