Posted 4/12/2009 17:00 (#677945 - in reply to #677105) Subject: Re: single line wet kit to dual line
Texas/New Mexico Stateline
Properly set up, unload time should be way under 10 minutes. More like 90 seconds. As to the original question if the pump is set up for an end dump it won't have enough flow to unload a belt trailer in a timely manner. Been there done that. I don't think heating would be a problem with a big reservoir regardless.