West Central MN (between MMF and Larson's) | We run a 24 foot mc dryer. Dump hot with 5” blower to bins. 750ish bph at 10 points and 1500ish bph at 5 points.
Wet bin is approximately 20000 bu.
Wet bin, dryer, pit and double runs were installed in 2016 and were for the most part spared damage this time. One of our 65,000 bu bins was built at that same time and wasn’t as lucky. Replaced both 65k bins with one ring taller since we reused the concrete and that’s the max we could do on that specific foundation.
Replaced 6-7 smaller bins lost with one 101k bin as it was less per bu and made sense.
Not sure how well these 2 pics show the dryer and wet bin
Edited by purplepride0 5/13/2023 14:02
(DJI_0011 (full).jpeg)
(IMG_3366 (full).jpeg)
Attachments ---------------- DJI_0011 (full).jpeg (89KB - 98 downloads) IMG_3366 (full).jpeg (74KB - 128 downloads)
|