AgTalk Home
AgTalk Home
Search Forums | Classifieds (35) | Skins | Language
You are logged in as a guest. ( logon | register )

Ag Leader YM2000 installation instructions
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
tedbear
Posted 9/11/2022 17:13 (#9840040 - in reply to #9839984)
Subject: RE: Ag Leader YM2000 installation instructions


Near Intersection of I-35 & I-90 Southern Mn.
The Side Mount moisture assembly can be used with your YM 2000. It is powered by a separate lead to the battery. You need to cut two holes in the clean grain elevator. Grain dribbles out of the "UP" side into a chamber where the moisture sensor measures it. When the chamber gets full a proximity switch starts a small auger to move some of the grain to the "DOWN" side of the clean grain elevator. This means that "new" grain is being measured by the sensor in normal operation.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)