Posted 6/14/2009 22:45 (#745343 - in reply to #743966) Subject: Re: Concrete pad for dryer
Garner Iowa
6 inches deep, tie rebar every 12 inches, double that where the legs will set, get the heaviest rated crete you ready mix will make. it wont break. Maintain a sterile zone 3 ft around the slab (gravel and roundup work well) to keep the rodents from burrowing.