My brother and I would like to set our new planter up using a hypro pump for starter rather than a John Blue ground drive. We would like to use the GS2 rate controller using Raven components to control the flow. Is anyone using the GS2 for swath control on the planter and for rate control? We would also like to set it up with either 3 or 4 sections and control it with the swath control depending on how many sections we set the planter up with. I like the 6 section electronic clutches due to cost, but have never heard anyone talk of them, and our dealership recommends the 8 or 12 section air clutch setups. Which would you recommend? I've never been around wiring up electric ball valves, but I would assume that relays could take care of controlling them with the swath control right? |