Posted 3/27/2024 13:28 (#10682760 - in reply to #10682659) Subject: RE: Double run or leg to fill bins?
I have no direct experience with either but based on what I see most newer commercial elevators doing is using a leg to lift grain vertically to the height of the first bin then using conveyors to move it horizontally to the bins. They seem to be moving away from building a really tall leg and using downspouts to reach bins.