Posted 1/25/2023 06:53 (#10058485 - in reply to #10058168) Subject: RE: feeder house floor 9560sts
MN
On our 9870s we cut out pieces 3/16" sheet metal about a 1/2 inch smaller then actual size,that covered the whole floor welded them in front and back,spot welded as far a I could reach on the sides.Its all welded to old flooring so it can be replaced when it wears out agaiin.Its been in use for 3 years,looks good yet.