Posted 11/21/2023 09:20 (#10490665 - in reply to #10489923) Subject: RE: Building a litter/lime conveyor
NE MO
I run lime with a conveyor. Most my lime is wet and heavy, especially this time of the year. When it gets too wet for trucks to get in the field I have them dump right in the hopper. It’ll load 20 ton in 2.5 min.