|
thumb of mi | Thanks for the replies. I was hoping to get by for 3-4000. That may be optimistic. For what I want to do I’m sure it would be a good idea to just take it uptown and have somebody do it. Getting it done in a time frame that keeps the project moving can be an issue. I like welding and like the flexibility to do it when I need it. I figured with Tig I would have a better chance of leek free welds better than with mig. After some practice anyway. | |
|