Posted 3/27/2024 12:11 (#10682659) Subject: Double run or leg to fill bins?
North Central Kansas,
Thinking about putting up another bin ( 60 ft , 105000 bu) Currently have 4 bins. one 36 ft, one 42 ft and two 48 ft bins.
Also thinking about filling the bins with a pit and double run up and across or.. a pit and leg. What are the pros and cons of the double run vs leg??