| Had to post this after read Mikes post. this building was up for
6 months. Plow Wind may have been in the 80mph range. It all
started from a broken pile(poor design by company) Another when
down 2weeks later about 30 miles from here. This was due to
post pulling out of the ground.
If you building make sure the 4 corner posts or piles are big
and deep. They are the most important in the design I had, as
it holds all the cross bracing.