The only difference between 3 phase and single phase is the cost to buy and run the phase converter. It is a factor in the decision but I would not let it be a limiting factor if other concerns say that the bins should be located elsewhere. We had a choice between adding new 3 phase service on the opposite side of the section and having unattended bins, spending about $30,000 to bring 3 phase to the current bin site, or use a phase converter. We're using the phase converter and it works fine. It does consume some power when unloaded, not sure if it really costs much when loaded or not. |