SW Indiana | Have ATS on the farm to pump into a semi tanker. Would like to load 32% at the river and then top off the load with ATS before pumping into the side dress bar. Does it make much difference as far as mixing goes which goes in first? 32% loads in the top at the river, ATS would be pumped in the bottom of the trailer. Would like to load the nitrogen then pump the ATS in the bottom at the farm to mix, any reason I need to do it the other way? | |
|