|
| Have a customer with a Great Plains box drill. 3 clutches. He wanted to have section control through his 2630 display this year so we had a harness made that goes between a single product Greenstar liquid rate controller and the drill. Our problem is now that we can do a section test, but when we are in the field, work switch engaged, the master does not control the clutches. They are always on, all the time. We do have relays on each section to flip signal around from the rate controller since it is configured as a planter.
We have a whisker switch, and it is working properly.
We tried another 2630 display.
Ideas?. I am going to check that the rate controller cuts out on drivers 4-6 on the 37 pin when we select those sections in the test.
| |
|