Posted 11/2/2011 15:47 (#2030452 - in reply to #2030437) Subject: Re: Erosion control in new waterway
SE Nebraska
Seems counterproductive. But what I have seen done around here is to blade up a blem on each side of the waterway to divert the water out of the waterway. Let the waterway establish then blade the blem down, usually into the ditch that was created by the water running along it.