|
SW WI | This is my summer project. Expanded the concrete, put in precast feed bunks with guardrail, and re-hung gates. I usually raise holstiens from 300 lbs to 800 lbs. They can get in the old dairy barn which has the gutters cemented over and equipment out of it. The yard used to have a small center feed alley which was in need of repair. The ties were rotted off and the rail was all bent. Also the path the cattle took to get in the barn was all mud. I am looking forward to placing cattle on this. Even with $7 corn
(IMG00193.jpg)
(IMG00181.jpg)
(IMG00182.jpg)
(IMG00190.jpg)
(IMG00196.jpg)
Attachments ---------------- IMG00193.jpg (80KB - 140 downloads) IMG00181.jpg (94KB - 129 downloads) IMG00182.jpg (84KB - 130 downloads) IMG00190.jpg (46KB - 131 downloads) IMG00196.jpg (88KB - 132 downloads)
| |
|