Posted 3/27/2025 18:00 (#11164095) Subject: Engineer for grain leg tower base
West Central Wisconsin
I’m having troubles finding a local engineer to design the foundation for my grain leg and tower at my new mill. It’s an 8x8 tower 60ft tall with a 70ft leg in it. Anyone have some ideas or know of a place to get the foundation engineered? At this point I’m thinking of pouring a 12x12x8 block of concrete