|
IA | Priced 3 different sizes from 60-107k they were in the $2-2.10/bu range. Power sweep stairs roof railing side draw concrete and erection. Those were GSI priced a Sukup and total cost was within 1,000 of same size GSI. Sukup dealer said things were defiantly slower. GSI dealer said he was actually ahead of normal for this time of year but feeling pretty fortunate as he had just been at their annual dealer conference and talked to several that had nothing or very little sold | |
|