|
| It is about 26 foot to the eave. I went back and looked and that is the capacity of the bin without the floor in it. As far as concrete I would have to go look in the files when I get to the farm in the morning, but off of memory... it was like 2 foot x 16" footer in the first pour and the other foot or so above the footer on the second pour and 8 inch minimum across the whole pad. 5000 psi I believe. I will say I personally don't think it had any too much steel in it but the guy who poured it built it to the exact spec as all of the other bins that size around here and they seem to have been fine. I would definitely pour our own next time though. | |
|