|
| Good day all,
Another FMX question from the peanut gallery. Just set up this display after running a 759 for too long. Love the display, but a little confused. In the implement setup I can set application offset, which is distance from rear axle to planter seed tube, right? In the Field IQ module, there is a 1 row offset. It appears to be if the row unit is even further back or what? Or should I set the implement to go to 3 point, and set 1 row offset from 3 point to seed tube??
Thanks for your help. I'll attach a pic of the field iq screen I'm talking about. The B parameter isnt right in that pic, fyi.
Eta- I switched B in the pic to zero, from 7 ft and it didn't really seem to make any difference on the swath control.
Edited by kwk 5/31/2024 18:40
(IMG-20240531-WA0116 (full).jpeg)
Attachments ---------------- IMG-20240531-WA0116 (full).jpeg (67KB - 85 downloads)
| |
|