North Central Kansas | Obviously we have gotten spoiled the last few years with dry open winters. Need to do something different where we load our feed wagon. We had SS5 down which is 2” limestone. It has blown through that. It did not have any fabric under it. I saw this stuff when I did a search. Apparently you put the fabric down and the. This grid system and fill with rock. https://www.agriculturesolutions.com/agtec-geocell-8-4ft-x-27-4ft-gr...
In the perfect world we would pour concrete. We may still do a small pad but can’t do the entire hill. | |
|