|
Pope County,MN | It's been a lot of dreaming, courage, planning, working, and patience. But it's nearly complete. This week the shack will be foamed, tinned and complete. Just electrical left then. The double runs just got done Thursday, as well as the new service trenches in. 2, 600 amp.
We dropped a 20x75 silo, scraped black, built everything to grade with clay. Made another driveway so we have a loop. Dirt work was a lot more than id anticipated. But its done right, and prepped for future bins. 2, 500 lowry pits, 48'x10 dry, 30x7 wet, 25' delux dryer. Getting pretty excited. Been renting a site for past 11 years 1 mile down the road from a friend.
(20240510_170215 (full).jpg)
(20240513_080848 (full).jpg)
(20240529_133405 (full).jpg)
(20240915_140308 (full).jpg)
(20240915_140500 (full).jpg)
Attachments ---------------- 20240507_132252.mp4 (17663KB - 1 downloads) 20240510_170215 (full).jpg (181KB - 8 downloads) 20240513_080848 (full).jpg (157KB - 7 downloads) 20240529_133405 (full).jpg (164KB - 7 downloads) 20240915_140308 (full).jpg (147KB - 7 downloads) 20240915_140500 (full).jpg (151KB - 8 downloads)
| |
|