|
NW Iowa | It is easier to lay the inside drying floor if you leave a few roof sheets off and hand in the drying floor through those spaces. You also have to know where the uprights go that hold the retaining rings above the drying floor. They differ, depending on the diameter of the bin. I found the assembly directions that I had saved. I have attached the file. If it doesn't come through, contact me directly. My email address is in my profile.
Attachments ---------------- Ezee Dry Assembly.pdf (14359KB - 10 downloads)
| |
|